SSTC benefits
- X-mas tree new installation tool
- Scale system fits all x-mas trees
- Installed outside of production current, SSTC is not exposed
to sand during production, resulting in less wear and tear
- No need to recover Tree Cap
- Less equipment required during installation
- No need to shut down other wells during installation
- Installation time 4- hrs
- No breach of tested barriers during operation
- Maintaining control
- 4” system allowing up to 8 m3/min pump rate (690 bar system)