SSTC benefits

  • X-mas tree new installation tool
  • Scale system fits all x-mas trees
  • Installed outside of production current, SSTC is not exposed
    to sand during production, resulting in less wear and tear
  • No need to recover Tree Cap
  • Less equipment required during installation
  • No need to shut down other wells during installation
  • Installation time 4- hrs
  • No breach of tested barriers during operation
  • Maintaining control
  • 4” system allowing up to 8 m3/min pump rate (690 bar system)